It was the new owners' initial requirement that the hull be absolutely sound, as only on a solid foundation could his new masterpiece be created. The hulls should have no rot, wet or dry, the boat had to be totally stripped out and then, inch by inch, nail by screw by plank, inspected and rebuilt. Thanks to the Western Australian surveyors specifications, what Mark found under the paint was still almost perfect.

All the old paint was burnt off the hull and all timbers taken right back. Not surprisingly, and a testament to the stout specifications of her scantlings when built, there was only one plank to port and one to starboard that needed replacement. The sheer strakes were removed, rebuilt and replaced. To these was fitted a jarrah rubbing strake with a brass 'D'-section to protect it. All fastenings and copper roves were tightened and where necessary, replaced. She was then totally re-corked in oakum and cotton. The traditional red leading, a rare commodity in these environmentally 'aware' days followed.

Silicon Bronze screws are used throughout her construction and all copper nails are twisted - as original.

The main saloon is a thesaurus' delight with words such as grandeur, luxurious, refined and sumptuous all coming easily to mind. Truly multi-talented, Mark usually does all his own upholstery, however the soft pleated leather seats were sewn by the artisans whose needles create the elite 'Chesterfield' range of furniture. When Mark said that the seat I was sitting on had cost $7000, I rapidly decided that maybe I'd sit outside. The style of the pleats, which were individually packed and stuffed, is again in the exact style of Tom's Rolls-Royce, and their soft pastel lime-green colour complements the warm glow of the solid timber burl veneer panels of American oak. The story behind the oak is just another in what could easily have become an afternoon of stories.

The owner wanted the instrument consol to match the dash of his Rolls Royce Silver Shadow 2 and so it was made of English Elm while the instruments and switches selected to match came from the Murphy collection. These were the only ones available with the large black numbers on plain white background. All switches too are of the push-pull type as they are in the Rolls-Royce.

Although barely 2m long and only holding aloft the required lights and a tiny flag, the mast was fashioned in the same manner as it would have been, had it been needed to carry a full set of canvas. Mark had to build a hollow section, laminated, a work of art, again with all the grains following and mirrored, including on knees and the spreaders. While discussing the mast I had it pointed out to me that even the lights were cast to fit on custom base plates.

The Bollards were custom designed to suit the boat and were one-off creations. Mark designed and made the model-plug of wood, shaping and changing it, until not only was it perfectly practical, but it also looked right when viewed from all angles, on and off the boat. Four of these were then cast in bronze and chrome plated.

Stepping out onto the aft deck, 'cockpit' covered in a white bimini, we can look up and see that even the lashing, which passes through the brass ringlets and around the stainless supports has been tied in the 'traditional' manner.

The finishing touches even, were not just 'touches'. As Mark neared the end of 20 months of 60 hour weeks, the perfect timber had to be found for the bowsprit. It was eventually found and hewn from a 50-year-old Jarrah mineshaft shore found 900 km inland in the outback-mining city of Kalgoorlie.

The engine room was in need of a major overhaul and was totally stripped. Originally called in to look over the 2:1 Borg-Warner gearboxes, which he stripped and reconditioned, veteran marine engineer Wayne Hayley found the 35-year-old engines in 'a sorry state' and took them away for some major TLC. Fortunately, being all cast iron, the Detroits had little of the electrolytic problems associated with the complex mix of alloys and metal types we see in modern engines. The pair of 90HP engines had liners and piston rings replaced, the replacement rings being cast iron ex-tractor rings, as the original GM spring-steel rings caused cylinder glazing. Being 2-strokes the exhaust valves needed replacement as did the blowers and all the electrics.

The rusty old cast iron water traps (baffles / mufflers or whatever you choose to call them) were removed from the exhaust system and the 'usual' bits of wire holding everything together were all replaced with custom made stainless brackets.

A thorough search through the foundry in Fremantle revealed the original 1962 casting for the exhaust baffle box (after substantial argument this is what I now call them).  This was pulled out of retirement and used to cast 2 new 3/4-inch bronze baffle boxes for the diesel engines that Wayne returned in better than new condition, 'ready for another 35 years'.

As with everything else they had to be exactly original, or at the very least, better than new.

All stainless brightwork was custom made in 316 stainless, not merely linished but to be faultless it all had to be highly polished. Then all mountings were routed in, flush with the wood they were fitted to. If you say it quickly this may all sound less than the mammoth task it really was. "Why not make things easy on yourself and...." I began to ask Mark, only to be cut short. "It would not be perfect then ...would it?" was the answer.

Mark hand selected each and every piece of teak used, $40 000 worth of 1/4 sawn dead straight grain, knot free timber, all measured and below 6% moisture

It is possible to board the vessel amidships on both sides. There the shaped teak rails are hinged and fitted with custom detailed stainless, moulded to the exact shape of the timber with even teflon inserts for the clips to snugly slide into.

Having taken around 400 hours to complete, the decks are incredible and a masterpiece unto themselves. Laid of 3/4 inch teak on a base of 5/8 marine ply, every scarf is on a deckbeam and again, only silicon bronze screws are used. Not only are the planks totally double-checked, but each side is perfectly mirror imaged, port and starboard. Every fuel filler, butt scarf etc is identical, port and starboard. When it all met at the stern Mark says it was 2mm out, personally I could not see it, but who am I to argue.

Of course, the hatches in the aft deck had to have their grain exactly matching the surrounding deck perfectly. Not only does the same wood grain follow up to, over and continue after the hatch, it is even mirrored perfectly. The hatch sits exactly on the vessel's centreline and each piece of timber to port matches it's opposite piece to starboard, not only in size and shape but right down to the way the grain curves, it's texture and shading. As perfect a mirror as nature would allow.
 
All external varnishing was done in Goldspar and floors in Awlgrip 2-pack.
The interior roof beams were made of Western Red Cedar and cambered perfectly to its original lines.

Walking around the deck Mark points out each item and meticulously describes how it came to be, how it was carefully considered, the options discussed between he and Tom, and then, how he actually went about the work.

The sliding side doors move like on silk, actually sitting on roller ball cars mounted to a mainsheet track, carefully concealed behind the stainless framework which surrounds the door. The barrel bolts were custom made, as were the collets which Mark said he guarantees will never rattle or stick.

For'ard the windows are custom made armor plated glass while the side and aft doors feature an etched blue Marlin, custom designed purely for the boat.

The portholes were not only cast in bronze with chrome plated bezels, but, in fitting with the aesthetics of the cabin top forward, each porthole becomes smaller than the previous as they near the bow.

The hawses are chrome plated copper with solid teak hand-cut dove tailed dorado boxes. The construction method followed through to the hatch covers that are likewise hand cut dove-tailed with mitre tops. This was a legacy of an apprenticeship which Mark says taught him to be precise. Each little box took a full day to make.

Of course, sometimes a line has to be drawn between looking original and being original. An electric loo was hidden below the matched teak seat, one of a few small modernisations that were necessary and an improvement on the original. The other was the use of halogen bulbs inside the imported light fittings, which were selected and purchased directly from Italy. The bulbs use less power and give a softer light that suits the interior. A larger 80 amp alternator to keep the 4 x 300 amp hour batteries charged is supplemented while berthed by a trickle charge, supplied by an unobtrusive flush mounted solar panel in the roof.

HomeHome.htmlshapeimage_2_link_0
FunctionsFunctions.htmlshapeimage_3_link_0
HireHire.htmlshapeimage_4_link_0
HistoryHistory.htmlshapeimage_5_link_0
BookingsBooking_enquiry.htmlshapeimage_6_link_0
vlaming classic chartersBooking_enquiry.htmlshapeimage_7_link_0